+
  • 1(1782119552325).png

Connecting rod

The excavator arm moves back and forth, requiring frequent braking and lifting. Most of the potential energy is consumed on the multi way valve port, which not only wastes energy, but also converts a large amount of potential energy into thermal energy, increasing fuel consumption, and easily causing hydraulic system heating, reducing the lifespan of components.

Part number:

keyword:

Category:

Link rod

Product Description

Part No.

Description

Application

1276371

LINK AS

950 GC, 950G, 950G II, 950H, 962G, 962G II, 962H

1332437

LINK

315B, 315B L, 317B LN, 318B, 320B, 325B L, 330B L, 345B

1332441

LINK

322B, 322B LN, 325B, 325B L, 330B L

1374117

LINK ASSEMBLY

966G, 966G II, 966H, 966K, 972G, 972G II, 972H, 972K

1748255

LINK & BEARING AS

318C, 319C, 320B, 320C, 320C FM, 320C L, 321C, 322C, 325B L, 325C, 325C L, 330B L, 330C, 345B II, 345B L

1865650

LINK AS

320B, 320C, 325C, 325C FM, 330C L, 345B II

1930953

LINK AS

938G, 938G II, 938H

1949829

LINK

313B, 320C, 322B L, 322C, 322C FM, 325C, 330B L

1985736

LINK AS

311C, 312B L, 312C, 312C L, 313B, 314C, 320C, 322B, 322B L, 322C, 322C FM, 323D L, 325C, 325D, 330B L, 330C, 330C L

1985737

LINK

311C, 312C, 312C L, 314C, 320C, 322B, 322C, 323D L, 325C, 325D, 330B L, 330C, 330C L

2417129

LINK

324D, 324D L, 324D LN, 324E, 324E L, 324E LN, 325D, 325D L, 326D L, 328D LCR, 329D, 329D L, 329D LN, 329E, 329E L, 329E LN, 330D, 330D FM, 330D L, 330D LN, 330D MH, 336D, 336D L, 336D LN, 336D2, 336D2

2444254

LINK AS

320D, 320D FM, 320D GC, 320D L, 320D LN, 320D LRR, 320D RR, 320D2, 320D2 GC, 320D2 L, 320E, 320E L, 320E LN, 320E LRR, 320E RR, 321D LCR, 323D L, 323D LN, 323D SA, 323D2 L, 323E L, 324D, 324D L, 325D

2444255

LINK

320D, 320D FM, 320D GC, 320D L, 320D LN, 320D LRR, 320D RR, 320D2, 320D2 GC, 320D2 L, 320E, 320E L, 320E LN, 320E LRR, 320E RR, 321D LCR, 323D L, 323D LN, 323D SA, 323D2 L, 323E L, 324D, 324D L, 325D

2602289

LINK & BEARING AS

319D, 319D L, 319D LN, 320D, 320D FM, 320D GC, 320D L, 320DLN, 320D LRR, 320D RR, 320D2, 320D2 L, 320E L 320E LN, 320E LRR, 321D LCR, 323D LN, 323D SA, 323D2 L, 323E L

MARK

A new type of tensioning oil cylinder applied in the tensioning device of excavators, wherein the piston rod is built-in in the cylinder body, and an oil injection through hole is set at the outer end of the cylinder body. The oil injection through hole runs through the interior of the piston rod, and a small oil cup is set at the inlet of the oil injection through hole. The small oil cup is equipped with a grease nozzle, and the cylinder sleeve is screwed to the outer wall of the cylinder body. The inner end of the screw is fixedly connected to one end of the piston rod, and a sealing ring is set at the connection between the screw and the piston rod, The sealing ring is arranged at the bottom end of the cylinder body; A guide sleeve, oil seal, and retaining ring are arranged between the lower end of the outer wall of the piston rod and the inner wall of the cylinder block; The outer end of the screw is fastened with a nut, and the outer side of the nut is equipped with a stop washer. This utility model has the characteristics of novel structure, more regular appearance, more scientific structural combination, more advanced technology, standardized material, high strength, more stable quality, stronger durability, and longer service life

FAQ

Please provide the right model number of your excavator or bulldozer, part number or specification drawing, pictures with any parts number on itself for us.We also can produce the parts according to your original sample.

? What main products do you supply? 2026-06-08 15:05:48.241

Track roller/Carrier roller/ E320 Sprocket/ Segment/ Front idler/ Track shoe/ track link/ Bolt/ Nut/ Pin/ Bushing/ Seal and gasket/ Filter/ Bucket teeth/ Bucket adapter and many other undercarriage parts available.

We will inform you the shipping information after your cargoes are dispatched.
Express shipment: we will advise you express tracking number.
Air shipment: we will send you AWB, Packing list and Commercial invoice.
Sea shipment: we will send you BL, Packing list and Commercial invoice.

? What is your delivery time? 2026-06-08 15:06:13.819

Generally, If we have your required items in stock, delivery time 7-10 days.
Or if your required items out of stock, the delivery time is about 15 days.
The actual delivery time depends on the items and the quantity of your order.

? How to make payment? 2026-06-08 15:06:23.397

Generally, If we have your required items in stock, parepare time 7-10 days.
Or if your required items out of stock, the delivery time is about 20-60 days.
The actual delivery time depends on the items and the quantity of your order.

Product testing legend

Metallographic analysis and inspection diagram

Metallographic analysis and inspection diagram

Appearance safety inspection

Appearance safety inspection

Appearance safety inspection 1

Appearance safety inspection

Appearance safety inspection 2

Appearance safety inspection

Message

*Leave your contact information to get a free product quote

Message

If you have any questions, please contact us!

Submit