+
  • 1(1782195334738).png

Thousand Autumn Rack

The excavator arm moves back and forth, requiring frequent braking and lifting. Most of the potential energy is consumed on the multi way valve port, which not only wastes energy, but also converts a large amount of potential energy into thermal energy, increasing fuel consumption, and easily causing hydraulic system heating, reducing the lifespan of components.

Part number:

keyword:

Category:

Bucket link

Product Description

Product name

CX230 Track Adjuster Assy,CX230 Recoil Spring Assy,CX230 Spring tensioner assy,CASE CX230 Excavator Undercarriage Parts

Material

25MnB,25CrMnB

Manufacturing Technique

Forging,Casting,Machining,Heat treatment,Assembly process

Finish surface treatment

Smooth and painting

Color

Black,Yellow &Customized

Packing

Standard exported wooden crate or pallet

Application

Excavator CASE

Business Scope

Bulldozer &excavator undercarriage parts etc

APPLICATION MODEL

ITEM NAME

OEM PART NUMBER

PC650

Track adjuster

21M-30-14310

PC60-7/PC70-7

Track adjuster

201-30-62312

PC60-6

Track adjuster

201-30-62310

PC45R-8/PC55

Track adjuster

20T-30-82130

PC40-5/6/7

Track adjuster

20T-30-31210

PC400-5/6/7

Track adjuster

208-30-54140/208-30-54141/208-30-74140

PC300-8

Track adjuster

207-30-74160

PC300-7

Track adjuster

207-30-74142

PC300-7

Track adjuster

207-30-74142

PC300-6

Track adjuster

207-30-19520

PC300-5/6

Track adjuster

207-30-54140/14Y-40-02003/14Z-30-31111

PC300-5

Track adjuster

207-30-54140/154-30-11752/3P1885

PC240-7

Track adjuster

206-30-72111

PC220-8/PC240-8

Track adjuster

206-30-22130/206-30-22140

PC20R-8

Track adjuster

20S-30-82130

MARK

A new type of tensioning oil cylinder applied in the tensioning device of excavators, wherein the piston rod is built-in in the cylinder body, and an oil injection through hole is set at the outer end of the cylinder body. The oil injection through hole runs through the interior of the piston rod, and a small oil cup is set at the inlet of the oil injection through hole. The small oil cup is equipped with a grease nozzle, and the cylinder sleeve is screwed to the outer wall of the cylinder body. The inner end of the screw is fixedly connected to one end of the piston rod, and a sealing ring is set at the connection between the screw and the piston rod, The sealing ring is arranged at the bottom end of the cylinder body; A guide sleeve, oil seal, and retaining ring are arranged between the lower end of the outer wall of the piston rod and the inner wall of the cylinder block; The outer end of the screw is fastened with a nut, and the outer side of the nut is equipped with a stop washer. This utility model has the characteristics of novel structure, more regular appearance, more scientific structural combination, more advanced technology, standardized material, high strength, more stable quality, stronger durability, and longer service life

FAQ

Please provide the right model number of your excavator or bulldozer, part number or specification drawing, pictures with any parts number on itself for us.We also can produce the parts according to your original sample.

? What main products do you supply? 2026-06-08 15:05:48.241

Track roller/Carrier roller/ E320 Sprocket/ Segment/ Front idler/ Track shoe/ track link/ Bolt/ Nut/ Pin/ Bushing/ Seal and gasket/ Filter/ Bucket teeth/ Bucket adapter and many other undercarriage parts available.

We will inform you the shipping information after your cargoes are dispatched.
Express shipment: we will advise you express tracking number.
Air shipment: we will send you AWB, Packing list and Commercial invoice.
Sea shipment: we will send you BL, Packing list and Commercial invoice.

? What is your delivery time? 2026-06-08 15:06:13.819

Generally, If we have your required items in stock, delivery time 7-10 days.
Or if your required items out of stock, the delivery time is about 15 days.
The actual delivery time depends on the items and the quantity of your order.

? How to make payment? 2026-06-08 15:06:23.397

Generally, If we have your required items in stock, parepare time 7-10 days.
Or if your required items out of stock, the delivery time is about 20-60 days.
The actual delivery time depends on the items and the quantity of your order.

Product testing legend

Metallographic analysis and inspection diagram

Metallographic analysis and inspection diagram

Appearance safety inspection

Appearance safety inspection

Appearance safety inspection 1

Appearance safety inspection

Appearance safety inspection 2

Appearance safety inspection

Message

*Leave your contact information to get a free product quote

Message

If you have any questions, please contact us!

Submit